| Our Quality Policy
•Zero Defects is the beginning of High Quality Request.
•Defection Correction is important process of Quality Improvement.
•Creation is the base of satisfying customer request
Quality Control Item
•Incoming Quality Control
•In-Process Quality Control
•Outgoing Quality Control

1. QC MANAGEMENT SYSTEM FLOW CHART


2. INCOMING QUALITY CONTROL
2-1.Job Function
•Incoming materials inspecification.
•New vendor evaluation & qualification.
•Incoming quality analysis.
•Spec issue & update.
•Vendor quality ranking
2-2.Operation Process
•RAW MATERIAL QUALITY CONTROL FLOW CHART:
NOTE:
1.All materials purchased are subjected to "incoming quality control" inspection according to mil-std- 105 sampling plan.
2.All materials that do not meet specifications are to be controlled to prevent unauthorized usage.

3. IN-PROCESS QUALITY CONTROL
3-1.Job Function
•Process capability control.
•Statistical analysis.
•Failure analysis.
•Spec issue & update.
•Operation instruction review.
•Scrap control.
•Rejected analysis.
•Control chart.
•Corrective action.
3-2.Operation Process
1.Before order start running, some pre-production parts are prior run to find if there is any operation wrong to prevent defective parts to be manufactured.
2.When production lines running, there are two ways to control products' quality:
•In-process qc inspectors according qualty tracking table to monitor some operations which easily cause defective pats.
•Any abnormal quality is found, inspectors should feedback the informations to qc engineer and concerned people, after analyzed and identified the problem area, then corrective actions shoould be taken right away to assure production line is under control again.
•We setup some qc points in line to measure transformers' electrical characteristics with 100% inspction to ensure our products is good. 
4. OUTGOING QUALITY CONTROL
4-1.Job Function
•Outgoing inspection.
•Records retention.
•Documentation checking.
•Provide certification.
•Statistical analysis.
•Acceptance sampling.
•Packing standard.
•Customer service.
4-2.Operation Process
•Outgoing qc inspectors base on mil-std-105 level ii sampling plan to inspect products and according inspction report to decide if submit products from production.
•All reject lots should be 100% inspected and reworking in production line before re-submission to qc department.
•QC department should perform the failure analysis and follow up the corrective actions.
•Outgoing quality control flow chart, pls refer next page!

5. QUALITY ASSURANCE
•QC system evaluation.
•Specification & drawing review.
•Quality monthly report.
•Quality object approach.
•Quality improvement activities.
•Quality control circle.
•Issue & review internal specification.
•Checklist review.
•Design review.

6. In-Process QC Flow Chart

|